top of page

Professional Services:

  • Design conceptualization & consultation
  • Space planning & layout proposal
  • Materials & color scheme advisory
  • 3D rendering & detailed drawing
  • On-site project management and site supervision

 

Masonry Works:

  • Construction of 50mm (thickness) cabinet base with side tiles

 

Plumbing Works:

  • Supply of labor & tools to connect kitchen sink and tap
  • Supply of labor & tools to install toilet accessories
  • Supply labor & tools to install 2 sets of instant heater OR 1 set of storage heater

 

Carpentry Works:

  • Design & fabricate top and bottom kitchen cabinet with solid plywood laminate finish
  • Supply & install 2-tiered stainless steel dish rack
  • Supply & install aluminium frame frosted glass with hydraulic lift-up system
  • Supply & install 3 pull-out drawers and 1 set of PVC cutlery tray

[all doors fully equipped with anti-slam ABS trimming hinges and runners]

  • Supply & install 5mm (thickness) tempered glass backsplash spray painted black/ white

 

Worktop Works:

  • Supply & install series 1 quartz worktop

 

Painting Works:

  • Supply of labor and materials to paint house (all walls and ceiling) using Nippon Vinilex 5000
  • Supply of designed LED ceiling lights
  • Supply of labor and tools to shift existing power-points in kitchen cabinet area

 

Miscellaneous Works:

  • Supply of labor for haulage and debris cleaning
  • Supply of labor for chemical wash and general cleaning after fitting works
  • Supply of labor and installation of aluminium grilles to house and window at service yard (non-powder coated)

 

Complimentary:

  • Free installation of stainless steel single bowl sink & cold water tap
  • Mayer MMGH882HI Hob & MMSI900HS-SS Integrated Hood
  • EQ HomeGuard (one year) inclusive of home quarantine payout, worldwide personal accident and pedigree pet cover

BTO 3 Room (Premier)

SKU: GS-3BTO-FULL
$11,899.00Price
  • Optional add-ons

    • Hacking of existing concrete support S$450
    • Applying water based sealant S$500

    Terms & Conditions

    • Items not quoted shall be deemed & regarded as Variation Order (VO)
    • Quotation based on floorplan/ estimation. Subject to final site measurements
    • Quotation does not include any additional fees incurred/ required by the relevant authorities/ building management
    • Upon acceptance, agreement signed cannot be terminated/ cancelled, otherwise a 30% forfeiture of the total amount will be charged.
    • Warranty against workmanship defects only and does not include normal wear & tear/ acts of god
    • Gong Studio reserves the right to amend the price quotes accordingly.
    • Gong Studio reserves the right to halt/ delay/ stop existing works in the event of any default in payments.
    • Gong Studio reserves the right to replace/ substitute material of the same value should the same not be available.

    Payment Terms

    • Upon confirmation of deposit $500
    • Commencement of works (50% of contractual quote)
    • Prior to commencement of carpentry fabrication (45% of contractual quote)
    • Within 7 days of completion after handing over (5% of contractual quote)

    Modes of payment

    • Cheque payment crossed and addressed to GONG STUDIO PTE LTD
    • Paynow UEN 201936954G
    • Bank transfer OCBC Current Account: 687814855001

     

    24 months warranty on all workmanship and 12 months warranty of equipment.

bottom of page